A hardware schedule checklist for architects and designers

A practical hardware schedule checklist: location, application, dimensions, fixing, finish, quantity, drawing reference and approval.

Hardware display and consultation area at Bharmal Hardware Khazana
Bharmal Hardware Khazana, Bhagal, Surat.

The useful starting point

Give each opening or furniture unit a reference. Record the application, dimensions, exact product, finish, quantity and drawing revision against it. Resolve compatibility before approving the visible finish.

01

Start with one line per location

A schedule should let a person who missed the design meeting order the correct item. Use the same location references on the plan, joinery drawing and quotation. Separate similar-looking items when their function or dimensions differ.

  • Location reference and room, such as W-01 / bedroom wardrobe.
  • Door, shutter or cabinet material; thickness and measured dimensions.
  • Function: fixed pull, passage handle, privacy lock, drawer runner or another defined use.
  • Manufacturer, model and exact finish code when selected.
  • Quantity, unit of supply and accessories included.
  • Drawing number, revision, approver and required decision date.
02

An example of a quotation-ready brief

Illustrative brief, not a product recommendation: “W-01, bedroom wardrobe; two shutter pulls; fixing centres 160 mm; shutter thickness 18 mm; finish to approved sample FS-02. Installer to confirm screw length and clearances before order. Model pending comparison.”

The unresolved model is visible, so the example cannot be mistaken for an approved purchase. For a drawer or sliding system, attach the selected manufacturer’s planning drawing rather than assuming the same cabinet dimensions work across ranges. Hettich’s planning resources are one example of model-specific drawings and fittings lists.

03

Approve repeated details once

For a repeated handle, hinge or drawer detail, compare a sample at a representative unit before releasing the full quantity. Check movement against adjoining walls, skirting, appliances and other shutters. Keep the signed sample reference with the schedule.

  • Freeze the model and finish after approval.
  • Require a new compatibility check for any substitution.
  • Update the schedule revision when a decision changes.
  • Keep installed model details and care instructions for handover.
Answers

Quick answers

What belongs in a hardware schedule?

Include location, application, substrate and thickness, dimensions, model, finish, fixing details, quantity, drawing revision and approval status.

Can an alternative fitting use the same drilling pattern?

Do not assume so. Compare the alternative’s technical drawing, clearances, fixings and performance requirements, then obtain approval before fabrication or installation.

Prepared with AI assistance as general website guidance. Check the exact product documents and application details with the supplier and installer before ordering.